BIM Model Synchronization

Construction

BIM model updated, clash detection runs between disciplines, issues logged in project management, RFIs generated, model versioned.

systemapidb
Why OSOP matters here

BIM coordination prevents costly construction rework. OSOP tracks every model update, clash detected, and resolution — reducing change order costs.

Workflow Steps (6)

1
BIM Model Update
event
2
Clash Detection
system
3
Issue Logging
db
4
RFI Generation
api
5
Model Version Control
system
6
Report Dashboard
api

Connections (5)

BIM Model UpdateClash Detectionsequential
Clash DetectionIssue Loggingsequential
Issue LoggingRFI Generationconditionalclash.severity == 'critical'
BIM Model UpdateModel Version Controlparallel
Issue LoggingReport Dashboardsequential
6
Steps
5
Connections
4
Node Types